MIRROR REPORTER
MASVINGO – The Design Team, an engineering company has been appointed by Masvingo City Council to do all the design work for the city’s new Central Business District (CBD).
Town Clerk, Engineer Edward Mukaratirwa told The Mirror that Masvingo’s new CBD which will be built to the west of the current CBD just across Mucheke River will be established on the smart city concept.
The Design Team is expected to complete the design work by December 2022 after which construction can start.
The design work involves feasibility assessment, doing initial designs, doing quantities and costs of material. The structures that will be designed include sewerage reticulation, roads, drainage system and public lightning.
The Design Team is also required to come up with financing models for the servicing of the extended CBD, said Mukaratirwa. Two of the models that have been mooted are preselling stands so that money could be raised for servicing or finding a partner that will bring in the finances into the project while council brings in the land.
Construction of buildings in the new CBD will commence once servicing is completed and some of the infrastructure expected there are a hotel, a US$5 million infectious diseases hospital, retail and wholesale shops.
The objective of the new CBD is to decongest the current CBD.


Its like you read my mind! You appear to know so much about this,
like you wrote the book in it or something. I think that you can do with a few
pics to drive the message home a bit, but other than that, this is wonderful blog.
An excellent read. I’ll definitely be back. xnxx